[vc_row css_animation=”” row_type=”row” use_row_as_full_screen_section=”no” type=”full_width” angled_section=”no” text_align=”left” background_image_as_pattern=”without_pattern”][vc_column][vc_text_separator title=”History” border=”no”][vc_empty_space][/vc_column][/vc_row][vc_row css_animation=”” row_type=”row” use_row_as_full_screen_section=”no” type=”full_width” angled_section=”no” text_align=”left” background_image_as_pattern=”without_pattern”][vc_column width=”1/6″][/vc_column][vc_column width=”2/3″][vc_column_text]
PT Perta-Samtan Gas was established under the name of PT E1-Pertagas by PT Pertamina Gas with ownership of 66%, and E1 Corporation, a limited company from South Korea, with ownership of 34%. Establishment of the company begins with the signing of the Joint Liquid Business Agreement (JLBA) between PT Pertamina (Persero) and E1 Corporation in August 2006, and the Shareholders Agreement (SHA) between PT Pertamina Gas and E1 Corporation in South Korea witnessed by the President of Republic of Indonesia in July 2007.
The Company was founded on May 7, 2008 with the goal to produce LPG (Liquified Petroleum Gas) in order to support the government in providing energy for the community, while reducing the load of government subsidies.
In August 2010, E1 Corporation transferred all their share ownership to Samtan Co., Ltd. Korea, a limited company of South Korea. Furthermore, as the realization of the transfer of shares, on January 28, 2011 Company’s name changes from PT E1-Pertagas to become PT Perta-Samtan Gas.
PT Perta-Samtan Gas setting up an NGL Refinery Plant consisting of Extraction Plant in Prabumulih and Fractionation Plant in Sungai Gerong, with design capacity of 250 MMSCFD. Construction of refinery (EPC and Commissioning) conducted by PT Tripatra Engineers & Constructors (TPEC) from July 2010 until April 2013. The project was inaugurated by the President of the Republic of Indonesia on December 6, 2012.
The period of pre-commissioning and commissioning was implemented in December 2012 to April 2013 which resulted in the production of 12,166 MT of LPG and Condensate amounted to 54,847 bbl. PT Perta-Samtan Gas commenced commercial operation for the first time on May 1, 2013.
The current content of LPG in the feed gas is 3.1% mol C3 and 1.45% mol C4 compared to the initial design (3.39% mol C3 and 1.48% mol C4). The maximum capacity of the refinery of PT Perta-Samtan Gas is currently producing only 500-540 MT/day meaning it is still operating at 75% of the design capacity.
Since the start of commercial operation on May 1, 2013 until December 31, 2016, PT Perta-Samtan refinery has produced 657,425 MT of LPG and handling Condensate of 2,159,850 bbl. LPG Sales to PT Pertamina (Persero) amounted to of Condensate 658,181 MT and Condensate delivery to PT Pertamina Gas amounted to 2,170,405 bbl.
[/vc_column_text][vc_empty_space][/vc_column][vc_column width=”1/6″][/vc_column][/vc_row][vc_row css_animation=”” row_type=”row” use_row_as_full_screen_section=”no” type=”full_width” angled_section=”no” text_align=”left” background_image_as_pattern=”without_pattern”][vc_column][vc_column_text][ps2id id=’2008′ target=”/][/vc_column_text][custom_font font_size=”30″ line_height=”26″ font_style=”italic” text_align=”center” font_weight=”300″ text_decoration=”none” text_shadow=”yes”]2008 2010 2011 2012 2013 2014 2015 2016[/custom_font][/vc_column][/vc_row][vc_row css_animation=”” row_type=”row” use_row_as_full_screen_section=”no” type=”full_width” angled_section=”no” text_align=”left” background_image_as_pattern=”without_pattern”][vc_column width=”1/6″][/vc_column][vc_column width=”2/3″][vc_column_text][ps2id id=’2008′ target=”/][/vc_column_text][vc_separator css_animation=”bounceInLeft” type=”normal” gradient_color=”yes” thickness=”5″][/vc_column][vc_column width=”1/6″][/vc_column][/vc_row][vc_row css_animation=”” row_type=”row” use_row_as_full_screen_section=”no” type=”full_width” angled_section=”no” text_align=”left” background_image_as_pattern=”without_pattern”][vc_column][vc_empty_space][vc_column_text][ps2id id=’2010′ target=”/][/vc_column_text][vc_row_inner row_type=”row” type=”full_width” text_align=”left” css_animation=””][vc_column_inner width=”1/6″][/vc_column_inner][vc_column_inner width=”1/3″][vc_column_text]
2008
[/vc_column_text][vc_column_text]The Company was established with the name of PT E1 Pertagas on May 7, 2008. A joint venture between PT Pertamina Gas (66%) and E1 Corporation, Korea (34%)[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/3″][vc_single_image image=”786″ img_size=”medium” alignment=”center” style=”vc_box_rounded” qode_css_animation=””][/vc_column_inner][vc_column_inner width=”1/6″][/vc_column_inner][/vc_row_inner][vc_separator type=”normal”][vc_empty_space][vc_column_text][ps2id id=’2011′ target=”/][/vc_column_text][vc_row_inner row_type=”row” type=”full_width” text_align=”left” css_animation=””][vc_column_inner width=”1/6″][/vc_column_inner][vc_column_inner width=”1/3″][vc_single_image image=”787″ img_size=”medium” alignment=”center” style=”vc_box_rounded” qode_css_animation=””][/vc_column_inner][vc_column_inner width=”1/3″][vc_column_text]
2010
[/vc_column_text][vc_column_text]By PT Pertamina Gas permission, E1 Corporation transferred its shares to Samtan Co., Ltd. NGL Plant Development in South Sumatra implemented by EPCC contractor, PT Tripatra Engineers & Constructors in July 2010.[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/6″][/vc_column_inner][/vc_row_inner][vc_separator type=”normal”][vc_empty_space][vc_column_text][ps2id id=’2012′ target=”/][/vc_column_text][vc_row_inner row_type=”row” type=”full_width” text_align=”left” css_animation=””][vc_column_inner width=”1/6″][/vc_column_inner][vc_column_inner width=”1/3″][vc_column_text]
2011
[/vc_column_text][vc_column_text]Amendment the Company’s name change from PT E1-Pertagas on to be PT Perta-Samtan Gas on January 28, 2011.[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/3″][vc_single_image image=”1084″ img_size=”medium” alignment=”center” style=”vc_box_rounded” qode_css_animation=””][/vc_column_inner][vc_column_inner width=”1/6″][/vc_column_inner][/vc_row_inner][vc_separator type=”normal”][vc_empty_space][vc_column_text][ps2id id=’2013′ target=”/][/vc_column_text][vc_row_inner row_type=”row” type=”full_width” text_align=”left” css_animation=””][vc_column_inner width=”1/6″][/vc_column_inner][vc_column_inner width=”1/3″][vc_single_image image=”794″ img_size=”350×150″ alignment=”center” style=”vc_box_rounded” qode_css_animation=””][/vc_column_inner][vc_column_inner width=”1/3″][vc_column_text]
2012
[/vc_column_text][vc_column_text]Inauguration of Refinery NGL Plant in South Sumatra on December 6, 2012 by President of the republic of Indonesia Susilo Bambang Yudhoyono.[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/6″][/vc_column_inner][/vc_row_inner][vc_separator type=”normal”][vc_empty_space][vc_column_text][ps2id id=’2014′ target=”/][/vc_column_text][vc_row_inner row_type=”row” type=”full_width” text_align=”left” css_animation=””][vc_column_inner width=”1/6″][/vc_column_inner][vc_column_inner width=”1/3″][vc_column_text]
2013
[/vc_column_text][vc_column_text]PSG’s refinery entered the commercial phase began on May 1, 2013.[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/3″][vc_single_image image=”790″ img_size=”350×150″ alignment=”center” style=”vc_box_rounded” qode_css_animation=””][/vc_column_inner][vc_column_inner width=”1/6″][/vc_column_inner][/vc_row_inner][vc_separator type=”normal”][vc_empty_space][vc_column_text][ps2id id=’2015′ target=”/][/vc_column_text][vc_row_inner row_type=”row” type=”full_width” text_align=”left” css_animation=””][vc_column_inner width=”1/6″][/vc_column_inner][vc_column_inner width=”1/3″][vc_single_image image=”669″ img_size=”350×150″ alignment=”center” style=”vc_box_rounded” qode_css_animation=””][/vc_column_inner][vc_column_inner width=”1/3″][vc_column_text]
2014
[/vc_column_text][vc_column_text]Succeed to manage the delivery of 100,000 Metric Tonnes of LPG for domestic gas purposes (South Sumatra) via pipeline.[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/6″][/vc_column_inner][/vc_row_inner][vc_separator type=”normal”][vc_empty_space][vc_column_text][ps2id id=’2016′ target=”/][/vc_column_text][vc_row_inner row_type=”row” type=”full_width” text_align=”left” css_animation=””][vc_column_inner width=”1/6″][/vc_column_inner][vc_column_inner width=”1/3″][vc_column_text]
2015
[/vc_column_text][vc_column_text]Achieved a Blue Proper for Extraction Plant and Fractionation Plant. Until December 31, 2015, PT Perta-Samtan Gas managed to produce LPG up to 485.877 Mton and Condensate 1,594,218 bbls.[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/3″][vc_single_image image=”5″ img_size=”350×150″ alignment=”center” style=”vc_box_rounded” qode_css_animation=””][/vc_column_inner][vc_column_inner width=”1/6″][/vc_column_inner][/vc_row_inner][vc_separator type=”normal”][vc_empty_space][vc_row_inner row_type=”row” type=”full_width” text_align=”left” css_animation=””][vc_column_inner width=”1/6″][/vc_column_inner][vc_column_inner width=”1/3″][vc_single_image image=”1050″ img_size=”350×200″ alignment=”center” style=”vc_box_rounded” qode_css_animation=””][/vc_column_inner][vc_column_inner width=”1/3″][vc_column_text]
2016
[/vc_column_text][vc_column_text]Safe man Hours Award achieving 9,674,272 hours of safe man hours from the Minister of Energy and Mineral Resources category PATRA NIRBHAYA KARYA MADYA on August 23, 2016. Succeed on HSSE Internal Assessment based protocol ISRS Series 8 achieving level 6. Successfully Achieved Blue Proper for Extraction and Fractionation Plants.
Relocation of Head Office from Jakarta to Sungai Gerong was conducted.[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/6″][/vc_column_inner][/vc_row_inner][vc_empty_space][/vc_column][/vc_row][vc_row css_animation=”” row_type=”row” use_row_as_full_screen_section=”no” type=”full_width” angled_section=”no” text_align=”left” background_image_as_pattern=”without_pattern”][vc_column][vc_column_text][/vc_column_text][/vc_column][/vc_row]